Two separate Silver Spring records: a 15-foot exterior drain and a crack repair photographed before injection, with packers installed, and after surface patching. Their diagnostic link and post-rain result remain unverified.
Three separate Rockville water-control jobs, now with real photos of the later downspout work. The staged pipe and house connection do not prove the final buried route.
Two distinct Gaithersburg crack-injection jobs, with real work-stage and patched-wall photos from the later repair. The record does not prove the earlier repair failed.
Kensington records list completed polyurethane injection and a later entry with no scope. They do not verify a second visit, a one-month curing period or the final outcome.
A real Foggy Bottom basement-wall crack-injection job, shown through crew-work and patched-wall photos. Scope confirmed; crack count and post-rain result not claimed.